4.5 SPL Scheduling
To schedule a Show Playlist playback, follow the steps below:
• Go to the Scheduling tab. See Section 6.2 for additional guidance about this tab.
• Click on the Add Schedule button.
• The following window will appear (Figure 8):
Figure 8: Add Schedule Window
• Select the Show Playlist that needs to be scheduled within the Show Playlist box.
• Choose the Screen Number and the date/time that is to be scheduled.
• Click on the Add button when finished.
• The new schedule will appear on the main window of the Scheduling tab.
• If the SPL is not on the SMS, then the TMS will initiate the SPL transfer to the SMS.
TMS.OM.000177.DRM Page 19 of 106 Version 1.4
Doremi Labs
Show Playlist list-
box
Screen Number list-
box
Comments to this Manuals